Engineering

Production

Painting

QC & IQC

Metal

Tooling

Engineering Departement

• R & D reliability testing room
• 1 Rapid prototyping machine – Stratasys – 360MC system

• R & D dark room
• Two 3D printers for quick mock-ups

Production Departement

• 7 assembly lines

• Capacity – 170.000 luminaires per month

Painting Departement

• Automated painting lines
• Manual wet painting chambers

• Powder coating line
• Metal preparation bath treatment

QC & IQC Departement

CG Lighting has a fully equipped laboratory and QC / QA testing and checking facilities as following:

• RoHS testing machine
• Photometric sphere / Double axis Goniometer
• IP testing chamber / Salt spray test machine

• EMC testing machine / Harmonic testing device / Flicker testing device
• Driver aging testing machine
• Vibration testing machine

• Draught-proof enclosure
• Temperature and humidity testing machine
• IK testing equipment
• In-line inspection / QA reliability testing rooms

Metal Departement

• Polishing
• Cutting
• Stamping
• Drilling

• Draught-proof enclosure
• Temperature and humidity testing machine
• IK testing equipment
• In-line inspection / QA reliability testing rooms

Tooling Departement

  • C.G. Lighting builds their own tools